The project for the warehouse facility was prepared according to national and European GDP standards. After the completion of the renovation work, validation tasks were carried out:

• Production of User Requirements Specification (URS)

• Production of Technical and Functional Specifications (DS & FS)

• Risk Analysis/Checklists (RA)

• Validation Master Plan (VMP)

• Warehouse Layout Planning

• Installation Qualification (IQ) of Warehouse and Engineering Systems

• Operational Qualification (OQ) Mapping of Warehouse and Engineering Systems (in an empty warehouse, without product), including measurements

• Performance Qualification (PQ) Mapping of Warehouse and Engineering Systems (with product and considering seasonal variations of winter/summer)

Provision of Italian brand Frimed refrigerators.